WH print pool report #5 UFC construction
- From
- Garrison, Joseph
- Sent
- Thursday, May 21, 2026 1:01 PM
As the pool waited outside the Oval Office for the event to begin, your pooler snapped a photo of the ongoing construction of the temporary UFC structure for Trump’s June 14 event.
There was one truck holding several large stacked panels and two orange backhoes. A black fence encircled much of the South Lawn. A few workers with neon construction shirts were walking around inside the fence.
Joey Garrison
White House correspondent
USA Today
XXX-XXX-XXXX
[EMAIL ADDRESS]
@joeygarrison
[EMAIL ADDRESS]
The Office of Communications · 1600 Pennsylvania Ave NW · Washington, DC 20500-0005 · USA